Awhitu Beach project
Preparation, supply and installation of a new stormwater outlet in an Auckland coastal environment, requiring careful planning and execution to manage tidal conditions and erosion risks. Works included excavation, placement of drainage infrastructure, and reinstatement to ensure long-term performance and environmental protection. The project was delivered with a focus on durability and minimal disruption to the surrounding area.
New carpark project
Complete preparation and asphalt installation for a new carpark, including site clearing, subgrade preparation, basecourse placement, and final surfacing. The works ensured a durable, well-drained surface suitable for ongoing vehicle use, delivered efficiently and to a high standard of finish.
Public drainage
Construction and upgrade of public stormwater infrastructure, including installation and relay of drainage systems to improve network performance. The project involved working within existing services and public areas, ensuring compliance, safety, and minimal disruption while enhancing long-term stormwater management.
Catching surface water project
Installation of a wing wall, dome inlet structure, and associated pipework to capture and redirect surface water flows. The system was designed to improve drainage performance, reduce ponding, and protect surrounding infrastructure through efficient stormwater control.















