What have we been up to this week..
Every week we will try to update you one what we have been doing this last week and the projects we have been involved with and services provided. Please get in touch if we can help you with your project.. Contact Enviro Civil
Week Ending 19 June 2026
Penrose
Awaiting final design approvalsPukekohe
Road crossing finished for potable water supplyAlfriston
Site establishment and silt control for stormwater upgradeAuckland City
Urgent stormwater repairServices delivered this week:
Site establishment
Silt Control
Urban excavation and stormwater repairs
Water main install completion
Week Ending 5 June 2026
Cambridge (Waikato)
Finished bases for fire suppression tanksPenrose
Car park extensions, sub base, drainage and pavingPukekohe
Water supply across public roadServices delivered this week:
Car park subbase, drainage and sealing
Tank base preparation
Hydro Excavation
Water main install
Week Ending 29 May 2026
Cambridge (Waikato)
Our 20-tonne excavator have finally finished on site and transported off site, after completing bases for fire suppression tank.West Auckland
Hydro excavation for repair to sewer main for Watercare after tree root infiltrationPukekohe
Drainage inspection completed and passed by council.Services delivered this week:
Drainage inspections on stormwater install
Tank base preparation
Hydro Excavation
Quarry finalisation
PS - 3rd photo is what we normally have to deal with!
Week Ending 22 May 2026
Cambridge (Waikato)
Our 20-tonne excavator and crew finishing up on site, added new manhole and pipeworkWest Auckland
Drainage completion and reinstatement completed.Pukekohe
Drainage testing completed.Services delivered this week:
Road base preparation
Building site preparation
New drainage installation
Quarry drainage, pipework and manhole install
Week Ending 15 May 2026
Cambridge (Waikato)
Our 20-tonne excavator and crew still at the quarry have a look our videoWest Auckland
Building platform completionsPukekohe
Cleaning of catch pits and setup for new drainage testingOrere Point
Completed drainage and building pad. Drilled holes for building foundations
Services delivered this week:
Road base preparation
Building site preparation
Hole drilling
Quarry material extraction
Week Ending 08 May 2026
Cambridge (Waikato)
Our 20-tonne excavator and crew still at the quarry with metal extraction and site development.West Auckland
Completed domestic drainage alterations and install of new pipework - the messy photo!.Orere Point
Completing foundations and building platformClevedon (Rural)
Sparkie called onto site, to give final power to newly installed controls, air pumps and submersible pumps. All up and runningHunua (Rural)
Completed access roads at rural property
Services delivered this week:
Earthworks
Site preparation
Septic system finals
Quarry material extraction
Week Ending 30 April 2026
Cambridge (Waikato)
Our 20-tonne excavator and crew commenced quarry operations, supporting ongoing material extraction and site development. This is shaping up as a longer-term project.Central Auckland
Completed domestic site preparation for a new shed on an urban property, including clearing, levelling, and base prep.Orere Point
Prepared a residential building platform and carried out groundworks ahead of drilling for shed foundations.Clevedon (Rural)
Completed septic tank repairs and system upgrade, improving wastewater performance and compliance.Clevedon Area
Ongoing wastewater pipework repairs and driveway metal supply and placement across multiple properties.
Services delivered this week:
Earthworks
Site preparation
Septic system repairs
Wastewater infrastructure
Quarry support